Indian Army also got iron in construction, 2 houses with 3D technology erected in 4 weeks

0

[ad_1]

Till now you must have heard and seen many stories of bravery of Indian Army in war. But the Indian Army keeps doing incredible things not only on the battlefield, but in other sectors as well. One such feat has been done by the engineers of the Indian Army in the field of construction. Actually, the Indian Army erected 2 houses in 4 weeks with 3D printing technology. There is a lot of discussion about this feat. Let us tell you the whole matter in detail.

house built in gandhinagar

Military Engineering Services, the engineering unit of the Indian Army, has done this feat in Gandhinagar, Gujarat. There the South Western Air Command has prepared the first 3D printed house so far. Both these 3D printed houses were inaugurated in the presence of Engineer-in-Chief Lt Gen Harpal Singh. He congratulated the team that made it on this special occasion and inspired them to continue such work in future also.

What is special in these two houses

The special thing about these two houses is that the engineering team of the army completed both of them in just 4 weeks. In these four weeks, not only the house was built, but dyeing-painting and other finishing works were also done in it. These houses are built on 3D printing technology.

read this also

How far is the way to make India a 5 trillion dollar economy? What does the government need to do to increase GDP?

Naxalites do IED blast in Narayanpur, Chhattisgarh, one officer martyred, one jawan injured

,

[ad_2]

Source link

Leave A Reply

Your email address will not be published.

error: Content is protected !!